Scope, sequence, timelines and the decisions worth locking down before demolition starts.
What actually drives shower remodel cost in Idaho
Shower remodel cost is driven by six things: the size of the wet area, whether the drain or valve moves, what is found behind the old tile, the waterproofing system, the tile format and layout, and the glass. Finishes get all the attention, but drain relocation and hidden damage are what move a quote the most.
Updated 2026-08-16How long a shower remodel takes, day by day
Most single-shower projects take one to two and a half weeks on site. The schedule is set less by labor than by waiting: waterproofing and mortar need to cure, grout needs to cure, and glass is fabricated only after the finished walls are measured.
Updated 2026-08-16