A shower remodel schedule, week by week
A typical single-shower remodel runs about two to three weeks of active work, plus glass. Week one is demolition, repairs and rough-in. Week two is waterproofing, tile and grout. Glass is templated after grout and installed one to three weeks later, with final trim after that.
Updated 2026-08-19Why shower projects slip, and how to avoid it
Most shower delays come from four places: selections made after work starts, special-order tile or fixtures that were not confirmed in stock, custom glass lead time, and hidden damage found at demolition. Inspections add days when they are scheduled late rather than in advance.