Nampa, Idaho
Leaking Shower Pan Rebuild — Nampa, Idaho
A stain on the ceiling below the bathroom traced to a mortar-bed pan with no usable membrane. The wet area was stripped to framing and rebuilt as a fully bonded system.

- Idaho contractor registration RCE-57919
- $5,000,000 liability insurance
- 1 year workmanship warranty
- 26 customer reviews
Project data
- Location
- Nampa, Idaho (Canyon County)
- Project type
- Shower waterproofing and pan rebuild
- Approximate wet area
- About 30 square feet
- Duration on site
- Roughly two weeks, plus drying time before rebuild
- Tile
- Reset with new porcelain wall tile and mosaic floor
- Waterproofing
- Bonded sheet membrane, banded corners, bonding-flange drain
Existing condition
A 1970s bathroom with a tiled shower that had been re-grouted repeatedly. The ceiling in the room below had a brown ring that reappeared after painting. Demolition found a mortar bed sitting on a shot pan liner, with the liner cut short at the curb and no protection at all where the drain met the bed.
What the homeowners wanted
Stop the leak permanently rather than chase grout, and rebuild in a way that could be documented and inspected.
Scope of work
- Full tear-out of tile, mortar bed and pan liner to framing and subfloor
- Moisture readings and drying of the framing before any rebuild
- Replacement of the damaged subfloor section and one bottom plate
- New bonding-flange drain assembly
- Sloped base, bonded sheet membrane over floor, curb, corners and walls
- Flood test before tile went on
- New porcelain wall tile, mosaic floor and full silicone at every change of plane
The problem we hit
The framing was wetter than it looked. Surface material was dry to the touch but meter readings at the bottom plate stayed high two days after demolition, which meant tiling on schedule would have trapped moisture inside a brand-new assembly.
How it was solved
We held the schedule, ran air movers and re-checked readings daily until the framing was back in range, then replaced the plate section that stayed elevated. It cost several days and it is the reason the rebuild is dry. We flood-tested the finished pan before a single tile was set, which is the only point where a pan can be proven rather than assumed.
Materials and systems
- Waterproofing
- Bonded sheet membrane with banded seams, corners and curb wrap
- Drain
- Bonding-flange drain matched to the membrane system
- Wall tile
- Porcelain field tile
- Floor tile
- Porcelain mosaic with tight joint spacing
- Verification
- 24-hour flood test before tile
Where to go next
Questions about this project
- Could this shower have been repaired instead of rebuilt?
- No. Once the pan liner has failed, everything above it is sitting on a system that cannot be repaired from the finished side. Re-grouting a failed pan buys weeks, not years.
- How do you know a new pan is watertight?
- A flood test before tile. The drain is plugged, the pan is filled and it sits. That is the only stage where a pan can be proven, which is why we never skip it.
Other projects

Curbless Tile Shower — Meridian, Idaho
An oversized corner garden tub and a 36-inch shower traded for one curbless wet area with a linear drain, a full-depth bench and a flush transition to the bathroom floor.
Read the case study
Tub-to-Shower Conversion — Boise North End
A 1920s North End bathroom where the original cast-iron tub came out and a low-curb tiled shower went in, inside the same 60-inch alcove and the same tight floor plan.
Read the case study
Large-Format Tile Shower — Eagle, Idaho
A master shower finished in 24x48 marble-look porcelain — few joints, a full-height niche column and a linear drain that let the floor pitch in one direction.
Read the case study
Planning a similar project?
Tell us what the room is doing today and what you want instead. We follow up to arrange a walkthrough and a written estimate.