Skip to main content

Star, Idaho

Fiberglass Unit to Tile Shower — Star, Idaho

A builder-grade one-piece fiberglass unit cut out and replaced with a tiled shower on a bonded membrane, with a niche, a corner seat and a frameless door.

Finished tile shower in a Star, Idaho home replacing a one-piece fiberglass unit, with greige porcelain walls, an accent niche and a frameless glass door
Star shower remodel — the old one-piece fiberglass unit replaced with tile on a bonded membrane, accent niche and frameless door. Representative photography of the work described — being replaced with job-site photos from this project.

Project data

Location
Star, Idaho (Ada County)
Project type
Full shower remodel
Approximate wet area
About 35 square feet
Duration on site
Roughly two and a half weeks
Tile
12x24 greige porcelain walls, mosaic floor, accent niche
Waterproofing
Bonded sheet membrane over pre-sloped pan

Existing condition

A one-piece fiberglass shower from a mid-2000s subdivision build. The pan flexed, the surface had gone permanently dull from hard water, and the caulk line at the base had been redone enough times to leave a ridge.

What the homeowners wanted

Replace it with a tiled shower that looks intentional rather than builder-standard, keep the same footprint, and get storage that is not a plastic corner shelf.

Scope of work

  • Cut out and remove the one-piece unit in sections
  • Inspect framing and subfloor at the pan perimeter
  • New mixing valve and trim
  • Pre-sloped pan with bonded sheet membrane across pan, curb and walls
  • Framed niche and a corner seat, both waterproofed as part of the same system
  • 12x24 porcelain walls with mosaic floor
  • Frameless glass door templated after tile

The problem we hit

A one-piece unit will not fit through a standard interior door, and the household had one other bathroom, so the room could not be out of service for long.

How it was solved

The unit was cut into sections and carried out, which is normal and is not extra demolition. We staged the work so the messiest phases happened back to back and the room was closed in before the tile phase, keeping the total out-of-service window inside what the household could plan around. Sequencing matters more than raw speed on a single-bathroom-down project.

Materials and systems

Waterproofing
Bonded sheet membrane with banded corners and curb wrap
Pan
Pre-sloped pan and bonded drain
Wall tile
12x24 greige porcelain, offset layout
Floor tile
Porcelain mosaic for slope and slip resistance
Glass
Frameless door, templated after tile

Where to go next

Questions about this project

Is a tile shower worth it over another acrylic unit?
It depends on how long you plan to stay and what you want the room to feel like. Acrylic is faster and cheaper; tile on a bonded membrane is a longer-lived assembly and is the only option if you want a custom footprint, niche or bench.
Can you work around one working bathroom?
Yes, and we plan the sequence around it. The out-of-service window is driven by cure and inspection times, not by how fast anyone works.

Other projects

Planning a similar project?

Tell us what the room is doing today and what you want instead. We follow up to arrange a walkthrough and a written estimate.