Replacing a tired, leaking or dated shower with a new wet area built on a complete waterproofing system.

Short answer

Most Meridian shower remodels we quote are subdivision-era master baths from the late 1990s through the 2010s: an unused corner garden tub, a narrow shower beside it, and a fiberglass or acrylic base that has started to flex. We rebuild the wet area to framing, correct what the tear-out exposes and put in a tiled shower on a bonded waterproofing system.

What shower remodeling includes in Meridian

  • Full removal of the existing shower or surround down to framing
  • Framing, blocking and subfloor repair where the tear-out exposes it
  • New mixing valve, supply and drain connections where the old ones are past their life
  • A single continuous waterproofing system across pan, curb, corners and walls
  • Pan set to the drain, tile or panel walls, niche and bench detailed in
  • Glass templated after the walls are finished, then final silicone and a care summary

What we find in Meridian homes

  • Meridian's growth boom means most of our work here is on homes 10 to 30 years old — the plumbing is generally fine, and the problem is layout and finish rather than rot.
  • The corner garden tub is the single most common thing we remove in this city. Reclaiming that footprint is usually what makes a Meridian master bath feel finished.
  • Second-floor master baths are common in the newer subdivisions off Ten Mile and Linder, so drain relocation depends on joist direction and access from below.

What moves the price

Projects we complete commonly land in a range rather than at a number, because the wet area size, what we find behind the old walls and the materials you pick move it more than anything else. You get a written figure after a walkthrough.

  • Whether the garden tub footprint gets absorbed into the shower or left as dead space
  • Moving the drain, which is the difference between a like-for-like rebuild and a re-layout
  • Glass — a frameless enclosure across a widened opening is a meaningful line item

Systems and materials we use

  • Bonded sheet membrane or waterproof foam board wall systems
  • Pre-sloped pans or site-built sloped mortar beds
  • Porcelain and ceramic tile, large-format panels or acrylic wall systems
  • Frameless, semi-frameless and framed glass

How the project runs

  1. 1Walkthrough and measurement in your bathroom, not over the phone
  2. 2Written estimate with scope, materials and the assumptions behind it
  3. 3Material selection — tile, pan, valve, glass and trim
  4. 4Permits confirmed with the local building authority where the scope requires them
  5. 5Scheduling, protection and dust control
  6. 6Demolition and inspection of what is behind the old shower
  7. 7Framing, plumbing and substrate corrections
  8. 8Waterproofing, with a flood test on the pan before tile
  9. 9Tile, grout and trim
  10. 10Glass templated to the finished walls, then installed
  11. 11Final silicone, cleanup, walkthrough and a written care summary

Permits in Meridian

City of Meridian Building Services

Permit and inspection requirements for shower work are set by the local building authority and change over time. Plumbing changes, drain relocation and electrical work commonly require a permit; a like-for-like surface replacement often does not. We confirm current requirements with the jurisdiction before scheduling, and we pull the permits our scope requires. For Meridian addresses, that is City of Meridian Building Services.

Shower Remodeling projects in and near Meridian

Guides worth reading first

Other shower work we do in Meridian

Prefer the statewide overview? Read about shower remodeling across Idaho.

Shower Remodeling in Meridian — questions

Do I need a permit for a shower remodel in Meridian?
If the scope changes plumbing, moves a drain or touches electrical, the City of Meridian typically requires a permit and inspection. A like-for-like surface replacement often does not. We confirm before scheduling and pull what the scope requires.
Can you take out the garden tub and keep a bathtub in the house?
Usually the hall or guest bath still has one, which is what matters for resale. If the garden tub is the only tub in the home, we talk that through before demolition.